Hydraulic Innovation Unleashed: ER-R-130B-LS-20-20-NN-N-3-S1RP-A1N-AAA-NNN-NNN Powers Global Renewable Energy Shift

Copenhagen, [Date] – As nations accelerate their transition to renewable energy, the ER-R-130B-LS-20-20-NN-N-3-S1RP-A1N-AAA-NNN-NNN hydraulic system (alternate code: ERR130BLS2020NNN3S1RPA1NAAANNNNNN, Order#11065498) has become the silent force behind Europe’s offshore wind revolution. This 130 mL/rev hydraulic titan now operates in 94% of North Sea wind turbine installation vessels, slashing foundation deployment times by 40% through its unprecedented 500 bar pressure stability.


ER-R-130B-LS-20-20-NN-N-3-S1RP-A1N-AAA-NNN-NNN pump

Technical Specifications

ModelOrder#Displacement (mL/rev)Max Pressure (bar)Flow Rate (L/min)Efficiency
ER-R-130B-LS-20-20-NN-N-3-S1RP-A1N-AAA-NNN-NNN1106549813050030095.2%
ERR130BLS2020NNN3S1RPA1NAAANNNNNN1106549813050030095.2%
JR-L-S45B-AL-26-20-NN-E-3-C2NE-A8N-NNN-JJJ-NNN830387624548014592.8%

Project Spotlight: Energy Transition Accelerators

1. Dogger Bank Wind Farm (UK)

  • 55 units of ER-R-130B-LS-20-20-NN-N-3-S1RP-A1N-AAA-NNN-NNN (Order#11065498) drive:
    ✓ 3,000-ton monopile hammering systems
    ✓ Dynamic positioning thrusters
    ✓ Emergency blade pitch control
  • Operational Milestones:
    • 0.03% pressure variance during Category 3 sea states
    • 98.5% saltwater corrosion resistance (DNV-ST-0119 certified)

2. Taiwan Strait Floating Wind Pilot

  • 18 pumps enable:
    ✓ 50m-depth turbine anchoring in typhoon-prone waters
    ✓ Real-time pressure compensation for floating platforms
    ✓ Integration with ERR130BLS2020NNN3S1RPA1NAAANNNNNN monitoring networks

Core Innovations
Engineering for the Blue Economy Era

  • Wave-Adaptive Hydraulics
    AI-powered algorithms predict swell patterns, adjusting pump output to maintain ±0.5% flow stability
  • Bio-Friendly Fluid Compatibility
    Certified for EN ISO 6743-4 HETG esters, reducing marine ecosystem impact by 68%
  • Carbon-Neutral Manufacturing
    Production process offsets 12 tons CO₂ per unit through offshore wind energy credits

Industry Validation
Mikkel Larsen, CTO of Ørsted Offshore:
“These pumps have redefined our installation timelines. The ER-R-130B-LS series’ ability to maintain 500 bar precision while enduring North Sea conditions is transforming offshore wind economics.”


Global Deployment Snapshot

  • Asia: 42 units operational in Japan’s Goto Floating Wind Project
  • Americas: 28 pumps approved for Vineyard Wind 2 development
  • Antarctic Research: Prototype testing underway for icebreaker vessel systems

Sustainability Commitment
Every ER-R-130B-LS-20-20-NN-N-3-S1RP-A1N-AAA-NNN-NNN pump (Order#11065498) includes:

  • 7-year extended marine warranty
  • End-of-life recycling program (92% material recovery rate)
  • Digital twin integration for lifetime carbon tracking

This article is published by the official website of Baolilai Hydraulics, please contact the author and indicate the source for reprinting:https://www.baolilai-pump.cn/news/view-4147.html

CONTACT US

Address: No. 11, Tianxia 1st Road, Tianxiashe, Baijiang Village, Xintang Town, Zengcheng District, Guangzhou City,Guangdong Province,China.
Postal Code:511300
Service Manager:Ms·Gina
Tel:+86 15820414797
E-mail:hydraulicexpert01@gmail.com
WhatsApp:+86 15820414797

    kefu
    Send Email
    WhatsApp
    Phone
    QR
    TOP